Environmental Protection Agency

EPA contracts cluster around Superfund remediation, environmental monitoring, laboratory analysis, and program support. Regional offices buy independently, so a strong regional footprint and local staffing plan matter.

Annual contract obligations
~$4B
Primary buying focus
Site remediation, environmental analysis, laboratory services, IT
Common NAICS codes
562910, 541620, 541380, 541512
Preferred vehicles
EPA regional IDIQs, GSA MAS

Key takeaways

  • Register in SAM.gov with NAICS codes aligned to EPA buying patterns before you chase a solicitation.
  • Track EPA forecasts and sources-sought notices — most awards are shaped months before the RFP drops.
  • Mirror the Section L instructions and Section M evaluation factors heading-for-heading in your response.
  • Quantify past performance with contract numbers, dollar values, periods of performance, and CPARS ratings.

How EPA buys

EPA awards flow through a mix of full-and-open competitions, small business set-asides, and task orders on existing vehicles. Most competitive dollars move through indefinite-delivery contracts, so incumbency on a vehicle is often the real gate. Watch the agency forecast, respond to every relevant sources-sought and RFI, and build relationships with the contracting officer and program office long before the solicitation posts.

What EPA evaluators reward

Technical volumes that are traceable to the statement of work score highest. Evaluators are scoring against a checklist derived from Section M, not reading for prose quality. Give them one clearly labeled response per requirement, show staffing that is realistic against the labor categories and clearances required, and prove risk mitigation with named plans rather than adjectives. EPA panels expect defensible technical methods and data quality objectives; QAPP-level detail is normal, not overkill.

Common reasons EPA bids lose

Missing a mandatory form or page-limit rule is the top cause of elimination — compliance failures are unrecoverable. After that: generic past performance that isn't same-size, same-scope, and same-complexity; unsupported labor mixes; pricing that can't be traced to the basis of estimate; and technical approaches that describe what the agency already told you instead of how you will deliver it.

FAQ

Do I need a contract vehicle to win EPA work?

Not always, but it helps. Many EPA requirements above the simplified acquisition threshold are competed as task orders on GWACs or agency IDIQs. Subcontracting or teaming with a vehicle holder is a common first step while you build past performance.

Where do I find EPA opportunities?

SAM.gov is the authoritative source for solicitations above $25,000, plus the agency's own procurement forecast for planned buys. RFP Scribe pulls the live SAM.gov feed so you can filter by agency, NAICS, set-aside, and due date.

How long does an EPA proposal take?

Teams typically spend two to six weeks on a mid-size response. RFP Scribe compresses the drafting phase by building the compliance matrix from the solicitation and generating first-draft narrative from your Company Brain.

Draft a compliant response for $2

RFP Scribe builds your compliance matrix and first draft from the solicitation and your Company Brain.

Get started

Services that help with this

Buy just the piece you need — most start at a few dollars, no subscription required.

Browse all services