How to Prepare for CMMC
CMMC readiness takes months and cannot be solved during a proposal. Scoping is the single decision that determines cost.
- Step 1
Scope where CUI lives
Identify every system, device, and person that stores, processes, or transmits CUI. Narrowing the boundary — an enclave rather than the whole company — is the largest cost lever available.
- Step 2
Assess against NIST SP 800-171
Run a control-by-control gap assessment across all 110 controls and score honestly. Inflated scores create false claims exposure.
- Step 3
Write the SSP and POA&M
Document how each control is implemented and schedule remediation with owners and dates for every gap.
- Step 4
Post your score and plan assessment
Submit your score to SPRS and, if the level requires it, schedule a third-party assessment well ahead of the bids you intend to pursue.
Checklist
- CUI boundary defined and diagrammed
- All 110 controls assessed
- SSP written and current
- POA&M with owners and dates
- SPRS score posted
FAQ
How long does CMMC readiness usually take?
Plan for two to four weeks the first time and a few days once your Company Brain holds reusable content, past performance citations, and compliance language.
Can RFP Scribe do this for me?
Yes. Upload the solicitation, pick a Company Brain profile, and RFP Scribe drafts a compliant response mapped to every requirement, with citations back to your source material.
More guides
Services that help with this
Buy just the piece you need — most start at a few dollars, no subscription required.
Source Selection Simulator
$8 eachTest how evaluators would score your proposal.
Buy NowGovCon Masterclass — Basics
$99Go deeper with structured video courses and certification.
Enroll NowProposal Writing Certification
$199Get certified and stand out to primes and agencies.
Get Certified